Twin-screw pump commissioning checklist
Publication time:2022-07-19     Hits:    


For commissioning of twin-screw pump at site, we recommend the operator to follow below before start:


Step

Job content

Notes

1

Check and make sure pump inlet and outlet flanges connecting directions are correct according to pump unit dimension drawing


2

Check and make sure pump external connecting and accessories are in place and clean


3

Check and make sure coupling between pump and motor alignment is acceptable, the alignment accuracy ≤ 0.2mm


4

Check and make sure pump rotors are free to be rotated from shaft end by external hands or proper tool


5

Check and make sure gear oil in timing gear housing and lubrication grease for front bearings are in place


6

Check and make sure motor electric wires connecting are correct, and point starting of motor to check pump shaft rotation direction is correct


7

Check and make sure to fill pumped liquid from pressure relief valve as per note requirement at 1st start-up or after a long time out of service


8

Check and make sure all valves connected inlet and outlet pipes are open and clean, discharge pipe is also open


 
Previous:CPO twin screw pumps for Nilam Surabaya Indonesia
Next:NO more
  • Products

  • Application

  • About Us

Contact SMC

Address:No.609,Tahui Road, Shihudang Town, Songjiang District, Shanghai, China   Email:sales@shenmech.com  
Copyright  ©  2021-  Shanghai Shenmech International Co., Ltd.  All Rights Reserved.